mereilin: (Default)
[personal profile] mereilin
The mud ended up having to dry overnight, so I got up at 6:00 to start laying the floor since the only time the plumber could come was 8:00 today. Well, or next week, but since I really wanted to have a working toilet by Sunday I took what I could get.

As expected the biggest timesucker in the floor was arranging and rearranging the tiles to figure out the best way to put them in. I got in just enough for the toilet to be installed, and the plumber is here now putting it in.

I feel like a cat waiting for the litter box to be scooped, man.
This account has disabled anonymous posting.
If you don't have an account you can create one now.
HTML doesn't work in the subject.
More info about formatting

Profile

mereilin: (Default)
mereilin

December 2018

S M T W T F S
      1
2345678
9101112131415
1617 1819202122
23242526272829
3031     

Most Popular Tags

Style Credit

Expand Cut Tags

No cut tags
Page generated Apr. 3rd, 2026 07:33 am
Powered by Dreamwidth Studios