Photo update!
May. 30th, 2008 09:55 amI have lots more pictures but this is the one I snapped with my camera phone to email to my dad. He talked me through the problem of the wall that's on the left side of the photo, which is basically rough framing around some freestanding pipes (the visible ones are part of the heating system). The frame stopped six inches short of the ceiling, and I discovered when I started to put up the new drywall that the face of it is uneven -- the center support sticks out nearly a quarter inch beyond the end supports.
Hooray for shims and, soon, drywall tape!
Anyway, here's the new toilet, neatly installed over the bare minimum of tiles necessary. I'll sort out the rest after I finish today's transcript.

Yeehaw!
Hooray for shims and, soon, drywall tape!
Anyway, here's the new toilet, neatly installed over the bare minimum of tiles necessary. I'll sort out the rest after I finish today's transcript.
Yeehaw!
no subject
Date: 2008-05-30 02:33 pm (UTC)You rock!
Date: 2008-05-30 02:39 pm (UTC)Oh and that is the same style I installed a few years ago!!
I love being a woman with power (and other) tools..:>
Re: You rock!
Date: 2008-05-30 03:11 pm (UTC)Re: You rock!
Date: 2008-05-30 04:04 pm (UTC)Re: You rock!
Date: 2008-05-30 06:30 pm (UTC)Loving the toilet though. :D
no subject
Date: 2008-05-30 06:35 pm (UTC)no subject
Date: 2008-05-30 08:45 pm (UTC)no subject
Date: 2008-05-31 12:13 am (UTC)Thanks! :D
Date: 2008-05-31 12:22 am (UTC)I'm actually seriously considering signing up for a plumbing certification course at the local tech school when the kids go back to school in September.
no subject
Date: 2008-05-31 12:33 pm (UTC)