(no subject)
May. 30th, 2008 08:48 amThe mud ended up having to dry overnight, so I got up at 6:00 to start laying the floor since the only time the plumber could come was 8:00 today. Well, or next week, but since I really wanted to have a working toilet by Sunday I took what I could get.
As expected the biggest timesucker in the floor was arranging and rearranging the tiles to figure out the best way to put them in. I got in just enough for the toilet to be installed, and the plumber is here now putting it in.
I feel like a cat waiting for the litter box to be scooped, man.
As expected the biggest timesucker in the floor was arranging and rearranging the tiles to figure out the best way to put them in. I got in just enough for the toilet to be installed, and the plumber is here now putting it in.
I feel like a cat waiting for the litter box to be scooped, man.